TRENCHLESS UNDERGROUND

Lijie trenchless drilling rig pipe jacking project

Lijie trenchless drilling rig pipe jacking project

HDD is a steerable tunneling method and is a two-stage process i.e. the pilot bore and the back reaming process, and can be used for small and large diameter pipelines. The. . HAB utilizes a casing system fitted with a cutting head and rotating auger that is jacked into the earth from the launching shaft. As the auger proceeds, it transmits torque to the cutting head. The soil cuttings generated from the cutting head are transmitted back. . Pipe ramming is carried out by using a percussive hammer attached to the end of the pipe or casing that pushes it into the soil. The leading. . Also known as the compression method, the installation is carried out by pushing or pulling the pipe through the borehole created by a mole. The mole is a streamlined tool in. [pdf]

CNC hydraulic trenchless drilling rig

CNC hydraulic trenchless drilling rig

XZ2860/XZ2860Plus adopts steel track self-walking chassis with strong adaptability,high reliability;World famous reducer with strong stability and good quality . Choosing Cummins turbo charged engine. Powerful and Meet the National II/III (Standard) stage emission standards. . According to the characteristics of the HDD trenchless rig, it apply advanced intelligent control technology, CAN bus technology, clear showed instrument. Using large size, high resolution monitor. Automatic show the actual push&pull force and rotary torque.. . Rotation adopts closed hydraulic system.Push&pull adopts loading sensitive control system.Imported components with reliable quality. . Front rocker arm and rear supporting cylinder amplitude of variation at the same time. Angle adjustment is easy and large range.. Drill frame is made of high strength steel welded. The standard for drill pipe bracket. The drill pipe can support automatic centering.. [pdf]

Russian underground mining down-the-hole drill rig

Russian underground mining down-the-hole drill rig

The Kola Superdeep Borehole SG-3 (Russian: Кольская сверхглубокая скважина СГ-3, romanized: Kol'skaya sverkhglubokaya skvazhina SG-3) is the deepest human-made hole on Earth (since 1979), which attained maximum true vertical depth of 12,262 metres (40,230 ft; 7.619 mi) in 1989. It is the result of a scientific drilling effort to penetrate as deeply as possible into the Earth's crust. DrillingDrilling at Kola SG-3 began on 24 May 1970 using the -4E, a serial drilling rig used for drilling . The rig was slightly modified to be able to reach a 7,000-metre (23,000 ft) depth. In 1974, the new purpos. . The stated areas of study of the Kola Superdeep Borehole were the deep structure of the , discontinuities and the thermal regime in the Earth's crust, the physical and chemical compositio. . The drilling ended in 1995 due to a lack of funding. The scientific team was transferred to the federal state unitary subsidiary enterprise "Kola Superdeep," downsized, and given the new task of thoroughly studying th. [pdf]

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.