
Ideal for remote pneumatic applications, emergency production line needs and other situations where electrical power is scarce, this air compressor delivers the air you need when and where you need it.Air compressor delivers 24.3 CFM @ 90 PSI100% continuous-duty, two-stage pump operating up to 175 PSI and a 30-gallon ASME receiver tank provide plenty of punch for the most demanding applicationsEasy starting 10 HP Yanmar diesel engine with electric start and fuel-efficient idle controlDurable cast iron construction, enclosed belt guard and weather-resistant powder-coat paint finish provides over 15,000 hours of trouble-free useIncludes low-oil level shutdown for the engine, for constant protectionAll season select synthetic lubricant increases efficiency; with 2000 hours of service between change-outs, it performs four times longer than petroleum-based lubricantsAir compressor works with start-up kit (item# 1738466, sold separately)Max PSI: 17510 HP Yanmar diesel engine2 stage air compressor with a 30 gal. horizontal air tank12 month warrantyYou can also purchase the Service Kit for this model which is TSC SKU# 2020668
[pdf] 1. Oil, gas, and mineral resources exploration 2. Engineering geological prospecting 3. Hydrological well exploration 4. Borehole in surface blasting 5. Gallery ventilation The crawler core full hydraulic drilling machine is a new type of integrated drilling rig developed on the basis of YG research and development of. .
(1) Full hydraulic drive, easy to operate; (2) Modular design, each component module is easy to assemble and disassemble. Also, it is convenient to derive series products, reduce the. .
Why do more and more people prefer to use crawler fully hydraulic core drilling rigs? There is no doubt that this is a good choice for operators.
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf]