1. Oil, gas, and mineral resources exploration 2. Engineering geological prospecting 3. Hydrological well exploration 4. Borehole in surface blasting 5. Gallery ventilation The crawler core full hydraulic drilling machine is a new type of integrated drilling rig developed on the basis of YG research and development of. .
(1) Full hydraulic drive, easy to operate; (2) Modular design, each component module is easy to assemble and disassemble. Also, it is convenient to derive series products, reduce the. .
Why do more and more people prefer to use crawler fully hydraulic core drilling rigs? There is no doubt that this is a good choice for operators.
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf] A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a fluid (air, water or ). The DTH hammer is one of the fastest ways to drill hard rock. The system is thought to have been invented independently by Stenuic. This method utilizes a unique hammer drilling system where the percussion mechanism is located directly behind the drill bit at the bottom of the hole. The system consists of three main components: a drill bit, a hammer mechanism, and drill pipes.
[pdf]