JDL 350 CRAWLER TOP DRIVE ROTARY CORE DRILLING RIG FOR

Domestic 350 down-the-hole drilling rig

Domestic 350 down-the-hole drilling rig

Compact and versatile drill under 2.7 tonnes (even with all options) Catch all size and wide range of applications Penetrometer option, can be used with open cage Very many options . Thanks to these unique specifications, this rig covers all drilling methods : 1. Conventional coring 2. Drilling with auger 3. Drilling with rotary. . Rigid welded chassis mounted on a hydraulic crawler with adjustable track from 78 to 118cm 4 hydraulic stabilisation cylinders Rock feed. . Triplex injection pump for water and mud drilling Winch for manoeuvring and clearing the hydraulic head Double rod brake Radio control for drilling functions Automatic dynamic. . Speed 314 rpm (standard motor) / 635 rpm (fast motor) / 710 rpm (perf + motor) Max. torque 208 daN.m (standard motor) / 103 daN.m (fast motor) / 229 daN.m (perf + motor) Hydraulic hammer out of hole 120j/cp - 1,600cps/min Traction 2404 daN Rod brake 4 tons (Ø. [pdf]

Crawler DTH Drilling Rig Configuration and Structure

Crawler DTH Drilling Rig Configuration and Structure

1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. . 1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. . When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper. [pdf]

Rotary Engineering Drilling Rig Acceptance Form

Rotary Engineering Drilling Rig Acceptance Form

1. A detailed rig acceptance procedure shall be included in any Call for Tender and in the rig contract. 2. Prior to the signing of a Well Operations contract or agreement, the. . 1. In addition, the rig owner must provide proof of class (Rig Certificates) maintenance according to inspections by relevant inspecting. . 1. The following minimum equipment shall be present and fully functional: 1. Full-opening safety valve and associated required Xovers 2.. . 1. A rig must be subjected to a comprehensive inspection covering as a minimum its vital equipment which must be found to be in good working condition. 2. Rig Vital. . 1. The rig inspection survey must be carried out by a recognised competent third-party in conjunction with the Well Operations and HSE functions. 2. The findings of the inspection must be prioritised and ranked. Items identified as having significant. [pdf]

FAQS about Rotary Engineering Drilling Rig Acceptance Form

What is a drilling rig inspection form?

This form provides a checklist for inspecting a drilling rig to ensure it meets safety and operational standards before acceptance. The inspection covers areas like fire equipment, safety signs, drill floor equipment, tongs, slips, elevators, drawworks, the derrick, mud tanks, mud pumps, engines, and general items.

What is a rig acceptance procedure?

A rig can be a drilling or work-over rig, snubbing unit, coil-tubing unit, wire-line rig or pulling rig. 1. A detailed rig acceptance procedure shall be included in any Call for Tender and in the rig contract. 2. Prior to the signing of a Well Operations contract or agreement, the Contractor and the Company must have agreed the acceptance criteria.

How many rig inspection forms are there?

It is made up of 35 inspection forms. The forms are designed to be used by rig workers to document the inspection of tools and equipment commonly found on rotary and workover rigs. Each inspection form includes instructions for assessing and recording the condition of the equipment.

What is a rig acceptance checklist?

This document is a rig acceptance checklist used by Halliburton to ensure safety and regulatory compliance at rig sites. It contains over 50 checklist items across 4 sections reviewing general site conditions, health safety and environmental issues, well control equipment, and the choke manifold and flare.

What is the final rig acceptance program?

One of the most critical phases of on boarding a new rig to your operations is the final Rig Acceptance program. Our teams are composed of personnel who are not only technical experts in the performance of the equipment packages for the rig, but also hold real world operational experience.

What are ADC energy's bespoke rig acceptance documents?

ADC Energy's bespoke rig acceptance documents are considerate to the Operator’s operational requirements & the specific rig.

Power Your Operations With Reliable Mining Equipment?

We are a leading manufacturer of drilling rigs and air compressors for mining and construction industries.