FACTORY ACCEPTANCE TEST PDF TURBINE PUMP

High Pressure Screw Air Compressor Acceptance Form
1-1 Scope of Application This document covers procedures and methods of tests, examinations and inspections to be performed to the Screw Compressor which has been manufactured and supplied by screw compressor vendors. 1-2 Purpose of Examination and lnspection The purpose of the examinations. . 2-1Genaeral General descriptionon examinations/inspections to be performed on the compressor proper and the relatedparts are mentioned in this chapter. The inspection itemsof each major part are shown in inspection and test plan. 2-2Material Inspection. . After completion of the test, the rotors and the rotor chamber will be visually inspected through the discharge nozzle. (The discharge side is under most severe conditions, and the visual inspection of the discharge side is a normal practice to check a rotor. . Following Items are measured in Heat Run, Mechanical Run and Performance Test: 1. Atmospheric Pressure 2. Atmospheric Temperature 3. Relative Humidity (Only in Performance Test) 4. Inlet Pressure 5. Inlet Temperature 6. Discharge Pressure. . Following componenets are used for test from Shop Facilities: 1. Driver( Motor) 2. Couplings 3. Baseplate 4. Suction Filter 5. Suction Silencer 6. Discharge Silencer 7. Lube Seal Oail Unit (Include Oil Reservoir) 8. Piping 9. Instruments 10. Thrust Bearing T em perature. [pdf]
How to fill in the acceptance form for down-the-hole drilling rigs
This information includes model, type, year of manufacture, dimensions, transportability, current location, etc. . The rig audit for energy sources includes diesel drives, electric drives, generators, transformers, and lighting. Type, model, technical characteristics date of manufacture, date of revision, and availability of the main consumables of all of the above. . The mud circulation system includes Mud Pump Systems, a Low-Pressure circulation system, and Solids Removal Equipment (Shale Shakers – Desander and desilters – etc.).. . In our simple Rig floor, TDS, Drawworks Commissioning guidelines, we shall cover the following: Hoisting/Auxiliary Equipment, Rotary Table and Top Drive, Emergency. . For the rig acceptance of the well control equipment on any onshore or offshore rig (Check also types of drilling rigs), three main terms are. [pdf]FAQS about How to fill in the acceptance form for down-the-hole drilling rigs
What is a drilling rig inspection form?
This form provides a checklist for inspecting a drilling rig to ensure it meets safety and operational standards before acceptance. The inspection covers areas like fire equipment, safety signs, drill floor equipment, tongs, slips, elevators, drawworks, the derrick, mud tanks, mud pumps, engines, and general items.
What is a DTH drill rig?
A down-the-hole drill, usually called DTH Drilling Rig, is basically a mini jackhammer screwed on the bottom of a drill string. The speedy hammer activity breaks hard stone into little flakes and dust and can be dismissed evident by the air exhaust in the DTH hammer.
What should be done before rig acceptance?
Make sure that both master points are clear of any material. T cardboard is updated and ready for use. 58. Ensure all wind socks on the rig floor and mud system are installed before rig acceptance. Senior Tool Pusher to prepare the following certificates and submit them to the company representative before Rig Acceptance for check:
What is a down-the-hole drill?
A down-the-hole drill, usually called DTH, is basically a mini jackhammer screwed on the bottom of a drill string.
What is down-the-hole (DTH) drilling?
Down-the-hole (DTH) drilling has made it easier for contractors to drill wells faster and more efficiently, and to transition from dirt boring to rock boring just by adding a compressor and hammer to the drill bit.
What are rig floor & TDs & drawworks commissioning guidelines?
In our simple Rig floor, TDS, Drawworks Commissioning guidelines, we shall cover the following: Hoisting/Auxiliary Equipment, Rotary Table and Top Drive, Emergency Generator, Rig Floor, Driller’s House (Check also Driller Job Descriptions), Rig Mast or Drilling Derrick, Tongs & Drilling Slips
