
First, you need to choose the location of the wellhead. Then use a shovel to dig a wellhead with a depth of 30-50cm and a diameter of 10-30cm. Move the installed rack to the wellhead and align it. Generally, the position of the drilling hole is required to be solid the surface soil of the drilling hole should be dense, and. .
Dig a reservoir with a diameter of more than 1.5 square meters and a depth of one meter at a distance of about four meters from the wellhead, of. .
Fasten the drill bit with the drill pipe link. The main controller hoist raises the nose, the other person cooperates with the drill pipe and the drill bit. .
After drilling down to the aquifer of ideal depth, record the depth of the aquifer and stop the water well drilling rigs. Open the water pump to press. .
After entering the first section of the drill pipe, the helper closes the fuse and inserts the bar. Then the reverse gear rotates the drill pipe. The answer ranges from just a few thousand dollars for a manual rig to several hundred thousand for a high-capacity commercial unit. The right rig for you depends on your drilling needs, budget, and long-term goals. Choosing the right rig is about more than price.
[pdf] 
Waterwell drilling is essentially drilling for underground water for agricultural and residential water needs. A perfect waterwell drilling setup would include: - A drill rig system which includes DTH hammer, DTH bit and drill tubes - Reliable skid mounted diesel air compressor.
Waterwell drilling is essentially drilling for underground water for agricultural and residential water needs. A perfect waterwell drilling setup would include: - A drill rig system which includes DTH hammer, DTH bit and drill tubes - Reliable skid mounted diesel air compressor.
When drilling a water well through the hard rock, no drilling method is as efficient as a DTH Hammer energized by the right air compressor providing high enough pressure. Softer grounds may also be drilled by air flushed rotary drilling, demanding a lower pressure air..
Air pressure requirement: The air compressor must provide sufficient air pressure to overcome the formation resistance encountered by the drill bit and maintain the drilling force. Typical air compressor pressures range from 7-30 bar (100-450 psi).
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf]